Customized Solutions

CUSTOM PRODUCTS

Custom Products Tailored to Your Needs

We provide custom products tailored to the needs of each customer.
We listen to your challenges, design and manufacture optimal products, and deliver high-quality solutions.

Custom Products Introduction Process

STEP1

Hearing and Requirement Definition

We listen carefully to your needs, including specifications and applications, and define specific requirements.

STEP2

Concept Design

Based on our technical expertise, our development team designs the product.

STEP3

Prototype Production

We evaluate the performance of the prototype in our facilities and have it verified in your application.

STEP4

Detailed Design

Based on the evaluation results of the prototype, we adjust and redesign specifications to maximize performance in your application.

STEP5

Production

We procure materials and carry out assembly and quality inspection in our factory to achieve QCD (Quality, Cost, Delivery) that satisfies our customers.

STEP6

Introduction

We conclude the trade contract and start providing the products.

Case Study: Precision Regulator

Customer Request

We need a regulator with excellent pressure characteristics within the required application range.

Design Requirements (Specification Requirements)

  • Supply Pressure: We want to keep pressure fluctuations within ±0.5kPaG at 0.25-0.5MPa.
  • Flow Characteristics: We want to keep pressure fluctuations within ±0.5kPaG at a maximum flow rate of 100L/min(ANR).
  • Pressure Reproducibility: We want to keep pressure within ±0.5kPaG even when the supply pressure is turned On/Off.

(Note: As a trade-off characteristic, relief flow/sensitivity is not required.)

Customization Details

Customizing some parts of the standard model R42-201-20T0

Customization Details

Characteristic Comparison (Pressure Characteristics)

Characteristic Comparison

Case Study: System Equipment

Customer Request

We want to reduce the installation space for gas control equipment.

Design Requirements (Specification Requirements)

  • The characteristics of each element cannot be changed.
  • The pressure supply port and mounting position on the equipment must remain unchanged.

Customization Details

  • Blockification of Flow Path
    Effect: Downsizing of equipment for space-saving installation. Simplified piping design.
  • Reduction of Number of Parts (Fittings: 11→4, Piping: 6→0)
    Effect: Reduction of parts management costs. Shortening assembly work time. Reduction of quality risks such as gas leakage.
Case Study: System Equipment

  • LUBRICATION UNITS FOR MACHINE TOOLS
  • PNEUMATIC EQUIPMENT FOR PRESS MACHINES
  • GENERAL PNEUMATIC EQUIPMENTS